Technical & compliance

The engineering behind the glass.

Structural glass has no dedicated Eurocode. That is not a gap to be worked around — it is the reason every assembly we deliver is calculated, specified and installed against a defined set of standards, and why we keep the evidence.

Standards

What we design and test against

A plain-English reference. If you are specifying structural glass, these are the documents that will be asked for at tender, at building control and at handover.

BS EN 12150

Thermally toughened safety glass

The product standard for toughened glass in building, including its characteristic bending strength. The starting point for every structural and overhead assembly.

BS EN 14179

Heat-soak tested toughened glass

Heat soaking drives out the risk of spontaneous breakage from nickel sulphide inclusions. We specify it as standard on structural work, overhead glazing and walk-on floors — not as an optional extra.

BS EN 14449

Laminated glass and laminated safety glass

Governs laminated build-ups and post-breakage integrity — the basis of every walk-on floor, glass beam and glass fin. Interlayers are chosen for stiffness and post-breakage behaviour, not cost alone.

BS EN 16612

Load resistance of glass panes

The calculation route for glass strength and deflection. Every bespoke assembly we deliver is assessed against it, for its own span, loading and support condition.

BS EN 12600

Pendulum impact classification

Classification of safety glazing by impact performance — relevant wherever glass sits in a critical location, and required evidence for glazed balustrades and doors.

BS 6180

Barriers in and about buildings

Line loads and deflection limits where glass forms a balustrade, screen or guarding element: 0.36 kN/m in private dwellings, 0.74 kN/m where overcrowding is not expected, 3.0 kN/m where crowds gather.

BS EN 1991

Actions on structures

Part 1-1 imposed floor loads, Part 1-3 snow, Part 1-4 wind. These give the numbers a glass floor or roof is actually designed against before any glass is selected.

BS 7976

Slip resistance (pendulum test)

The test method for walk-on glass surfaces. We specify to a declared wet pendulum test value — typically 36 or above — and can supply the test data.

BS EN 14351-1

Windows and doors — product standard

The harmonised standard behind CE and UKCA marking for the window and door systems we install, with declared air, water and wind performance.

BS EN 1364-1 · BS EN 1634-1 · BS 476-22

Fire resistance of glazed elements

Test methods for fire-resisting screens, doors and non-loadbearing elements. A rating is only valid when the glass, frame, seals and fixings match the tested system exactly.

CWCT TN92 · ACR[M]001

Non-fragility of roof glazing

The test methods for whether an accessible roof assembly will arrest a fall. Relevant to any glass roof on a walkable or maintenance-accessed surface.

Approved Documents

K · B · E · F · L · O · Q

Protection from falling, fire safety, acoustics, ventilation, energy performance, overheating and security — the regulations our detailing has to satisfy, alongside planning and conservation constraints.

Building Safety Act 2022

Duty-holder and gateway regime

Product evidence, competence and the golden thread now drive procurement on higher-risk buildings. We assemble and retain the documentation as part of our scope.

PAS 24 · Secured by Design

Enhanced security performance

Relevant to ground-floor sliding and entrance doors on domestic projects, and increasingly requested by insurers and local authorities.

The numbers

What a glass assembly is actually designed against

These are the parameters that decide the build-up, the span and the price — long before any glass is selected. Indicative values for early-stage discussion; every project is calculated in full.

Imposed floor load — domestic

1.5 kN/m²

Living spaces, kitchens and landings, to BS EN 1991-1-1. The baseline for an internal walk-on glass floor.

Imposed floor load — higher duty

3.0 – 5.0 kN/m²

Home gyms, roof terraces, commercial floors and areas expecting larger gatherings. The build-up and span change with it.

External deck or balcony

2.5 kN/m² and above

External walk-on glass also has to shed water, resist frost and take a higher duty than an internal floor.

Barrier line load

0.36 / 0.74 / 3.0 kN/m

To BS 6180 — private dwellings, areas not susceptible to overcrowding, and areas where crowds gather.

Deflection — glass floors

Span / 300 or stricter

Tighter than the code minimum, because perceptible bounce is what makes a glass floor feel unsafe, even when it is not.

Deflection — glass beams & fins

Span / 200, or 20mm, whichever is less

Deflection governs glass beams and fins more often than stress does, and buckling restraint has to be designed in.

Glass fin and beam laminates

Typically 10+10mm to 12+12mm

Spans of 2.5–6.0m are routine; much longer spans are achievable with stiffer interlayers and intermediate restraint.

Walk-on glass build-up

25.5mm internal · 33.7–44.4mm external

25.5mm is typically three 8mm toughened plies with two interlayers; external and higher-duty floors step up in thickness and stiffness.

Support and bearing

Four-edge support · 20–25mm bearing

On a structurally fixed frame, with neoprene or EPDM setting blocks so no glass ever touches metal directly.

Setting-out tolerance

Within 1mm/m

Glass cannot be packed or adjusted after manufacture. Frame levelling has to be right before the panes arrive.

Slip resistance

PTV 36 or above, wet

Measured to BS 7976 on the finished surface, in the wettest condition the floor will realistically see.

Acoustic performance

Around 40 dB · 45 dB+ separating

DnT,w for an internal glass floor; separating floors between dwellings need more, and the build-up is matched to it.

How a project runs

Five stages, with the risk taken out of each one

Design and engineering are carried out by us. Manufacture is by our specialist system and glass partners. Installation is by our own teams.

01

Consultation and site review

We visit, listen to the brief and test it against the building. You get an honest view of what is achievable, an indicative cost range and a realistic programme before you commit.

02

Design and engineering

Structural calculations, glass build-ups, fixing details, interfaces and weathering are resolved and issued. This is where a structural glass project is won or lost.

03

Manufacture by our specialist partners

Your glass and your systems are produced by our manufacturing partners — Vitrocsa, Schüco, Solarlux, Velfac and specialist laminated-glass producers — to our drawings and our specification, with the certification we require.

04

Installation by our own teams

Our installers handle, set and seal the glass. Cranage, access, permits and protection are planned with the site team beforehand, not improvised on the day.

05

Aftercare and documentation

Handover includes guarantees, care instructions and the product records for the project file, with aftercare and glass repair available afterwards.

Support for specifiers

What we put in your hands

Enough information to specify structural glass properly, and enough evidence to defend it afterwards.

Structural calculations

Glass strength, deflection, buckling and fixing calculations to BS EN 16612 and the relevant product standards, issued as part of our scope rather than left to you.

Specification writing

Bespoke specification clauses and product data for your package, so structural glass and minimal-frame systems are described accurately in the tender documents.

System selection

An honest view of which sliding, pivot or façade system suits the opening — including where a slimmer system earns its cost and where it does not.

CPD for practices

RIBA-appropriate CPD sessions covering system selection, glazing performance, fire strategy interfaces and the points where structural glass projects commonly go wrong.

NBS Source

Published product and system information, so our systems can be incorporated directly into an NBS specification.

Building Safety Act records

Product evidence, test certification and installation records collated and issued for the golden thread of the building.

Guarantees & aftercare

Documented at handover

Documented, not assumed

Product and workmanship guarantees are issued in writing at handover, aligned to the systems actually installed.

Installed as tested

We install to the tested detail, which is what makes a fire rating or a structural performance figure meaningful on a completed building.

Aftercare

Care instructions, inspection advice and glass repair after practical completion, by the same teams who installed the work.

Accredited and approved: FENSA · GGF Member · Constructionline · CAB · SSIP · RIBA CPD Provider · NBS Source · ISO 9001. Certification, insurance details and test evidence are available on request for tender submissions.

Technical enquiry

Ask us the difficult question early.

Pre-tender technical meetings and CPD sessions are how most of our best projects begin. Bring the drawing, the span and the constraints — we will tell you honestly whether it works.